Skip to main content
Back to blog

14 November 2026 · 5 min read · Team InTransparency

How to evaluate a project so it speaks to employers too

A grade on its own says how much, not what. A few criteria drawn from the learning outcomes and a comment that cites the work make an evaluation useful to the student, and readable by whoever hires them. A method for teachers, built on the European definitions.

assessmentteachersprojectscompetencesEQF
The InTransparency evaluation requests page, where a teacher assesses students' projects

An eight out of ten on a project says how much you liked it. It does not say what the student did, what they can do now and what they still lack. For the student it is thin information; for whoever reads their profile one day, a company deciding whether to call them, it says almost nothing. With a little more work the same evaluation can say far more.

What Europe means by competence

The Council Recommendation of 22 May 2017 on the European Qualifications Framework (EQF) gives two definitions that matter to anyone who assesses.

Learning outcomes are "statements regarding what a learner knows, understands and is able to do on completion of a learning process".

Competence is "the proven ability to use knowledge, skills and personal, social and/or methodological abilities, in work or study situations and in professional and personal development".

The word that matters is "proven". A competence is not declared; it shows in something that was done. A project is exactly that: a study situation in which the student used what they know. The evaluation is the moment when someone who watched them work says what that work proves.

The Council Recommendation of 22 May 2018 on key competences adds that competences are "a combination of knowledge, skills and attitudes", and suggests translating their descriptions into "frameworks of learning outcomes", with tools for "diagnostic, formative and summative assessment".

A few criteria, taken from the learning outcomes

A rubric with twelve rows ends up filled in a hurry. Better three or four criteria, taken from your course's learning outcomes and written so they can be observed in the work.

A criterion like "technical competence" says nothing. One like "the program handles the emergency stop and documents it" can be checked by opening the project. The same goes for a lab report ("the conclusions follow from the data collected, and the limits of the measurement are stated") or a communication plan ("every action has an audience and a way to tell whether it worked").

Three tips:

  • Share the criteria before the deadline. The student knows what they will be judged on, and the work improves for that reason alone.
  • Separate the individual from the group. In a group project, ask each student which part they handled, and assess that.
  • Keep the project distinct from the person. The judgement on the project is about the work. If you want to say something about how the student works, for instance how they handled a deadline, also write when you saw it.

A comment that cites the work

The grade summarises; the comment explains. A useful comment has three short parts.

  1. What they did. The task, in the words of the trade: "designed and tested the line's start-up sequence".
  2. How they did it, with an example from the project. "After the first test they rewrote the alarm handling, and the second version flags the fault before the line stops."
  3. What is left to improve. "The documentation is still written for themselves: whoever picks it up struggles to follow it."

Compare that with "excellent work, motivated student". The second comment could sit under any project; the first can only sit under this one. That is the difference a company notices.

The point to improve does not take value away from the evaluation; it makes it credible. An entirely positive judgement reads as a courtesy; one that also says where the student needs to grow reads as the view of someone who knows them.

Why your note is worth more than the grade

Almost everything in a profile is written by the student: the project description, the list of competences, the experience. That is as it should be, but readers know it. Your note is the only part that comes from someone who followed the work as it took shape, and a company cannot get it from any other source: not from an interview, not from a test.

That is why it is worth writing when the student asks for it, for the project they consider most representative. An evaluation that was asked for is one the student will use; and it costs you a single note, on the work you know best.

Where the school uses InTransparency, a student can ask you to evaluate a project in their portfolio: you give a rating and a comment, and the project shows as "Evaluated by a teacher". The request always comes from the student.

Your next step

Take the next project you have to assess. Before the deadline, write three criteria drawn from the course's learning outcomes and share them with the class. After submission, write three sentences for each student: what they did, an example from the work, what is left to improve. It takes a few extra minutes per student, and the evaluation will speak to whoever hires them too.

Newsletter for schools

Placement, work-based learning and first jobs: rules that change, the year’s deadlines and practical tools for staff who run internships and careers guidance. At most once a month.